ITAC Assessment: NV0004
ITAC logo
ITAC Assessment: NV0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Mobile Communication Shelters
NAICS
n/a
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 42,000
ft2
Annual Production 10
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,365 544,256
kWh
Natural Gas $10,375 2,289
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,241 $146 $2,241
29,308
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,534 - $1,534
20,223
kWh
-
03 2.7444: Close holes and openings in building such as broken windows $1,099 $350 - $1,099
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $4,202 $1,920 - $4,202
-
MMBtu
05 2.4133: Use most efficient type of electric motors $14 $20 $14
293
kWh
-
TOTAL RECOMMENDED $9,090 $2,436 $3,789
49,824
kWh
$5,301
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs