ITAC Assessment: NV0002
ITAC logo
ITAC Assessment: NV0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product small plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 102
Plant Area 31,000
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,855 1,132,767
kWh
Natural Gas $5,440 1,265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,032 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,622

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,302 $2,900 $2,302
27,257
kWh
-
02 2.7135: Install occupancy sensors $753 $40 $753
8,792
kWh
-
03 2.2511: Insulate bare equipment $3,943 $208 $3,943
17,292
kWh
-
04 2.7261: Install timers and/or thermostats $2,657 $1,128 - $2,657
-
MMBtu
05 2.7491: Insulate glazing, walls, ceilings, and roofs $980 $1,300 - $980
-
MMBtu
06 2.7243: Improve air circulation with destratification fans / other methods $406 $500 - $406
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,991 $1,000 - $1,991
-
MMBtu
TOTAL RECOMMENDED $13,032 $7,076 $6,998
53,341
kWh
$6,034
-
MMBtu
TOTAL IMPLEMENTED $9,622 $5,908 $6,245
44,549
kWh
$3,377
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs