ITAC Assessment: NV0001
ITAC logo
ITAC Assessment: NV0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Ski Lifts
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 61,700
ft2
Annual Production 3
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,734 906,800
kWh
Natural Gas $24,733 3,821
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,612 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $18,217 $2,068 $4,433
52,462
kWh
$13,784
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,640 $1,653 $3,640
43,083
kWh
-
03 2.4131: Size electric motors for peak operating efficiency $520 $120 $520
6,155
kWh
-
04 2.2437: Recover waste heat from equipment $3,884 $1,200 $3,884
46,014
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $1,183 $600 - $1,183
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $168 $120 $168
2,052
kWh
-
TOTAL RECOMMENDED $27,612 $5,761 $12,645
149,766
kWh
$14,967
-
MMBtu
TOTAL IMPLEMENTED $18,385 $2,188 $4,601
54,514
kWh
$13,784
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs