| Assessment Year | 1994 |
|---|---|
| Principal Product | Ski Lifts |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 55 |
| Plant Area |
61,700
ft2
|
| Annual Production | 3
pieces
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $76,734 | 906,800 |
kWh
|
$0.085 |
| Natural Gas | $24,733 | 3,821 |
MMBtu
|
$6.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,612 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,385 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $18,217 | $2,068 |
$4,433
52,462
kWh
|
$13,784
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,640 | $1,653 |
$3,640
43,083
kWh
|
- | |
| 03 | 2.4131: Size electric motors for peak operating efficiency | $520 | $120 |
$520
6,155
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $3,884 | $1,200 |
$3,884
46,014
kWh
|
- | |
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $1,183 | $600 | - |
$1,183
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $168 | $120 |
$168
2,052
kWh
|
- | |
| TOTAL RECOMMENDED | $27,612 | $5,761 |
$12,645
149,766
kWh
|
$14,967
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,385 | $2,188 |
$4,601
54,514
kWh
|
$13,784
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs