| Assessment Year | 2023 |
|---|---|
| Principal Product | Electrical component manufacturing |
| NAICS | 335932: Noncurrent-Carrying Wiring Device Manufacturing |
| SIC | 3644: Noncurrent-Carrying Wiring Devices |
| Sales Range | $100 M to 500M |
| # of Employees | 283 |
| Plant Area |
500,000
ft2
|
| Annual Production | 183,443,403
lb
|
| Production Hrs. Annual | 8,064
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $2,280,159 | 32,417,013 |
kWh
|
$0.070 | |
| Electricity Demand | $116,701 | 10,806 |
kW-mo/yr
|
$10.80 | |
| Electricity Fees | $98 | - |
|
- | |
| Natural Gas | $1,223,108 | 1,035,329 |
MMBtu
|
$1.18 | |
| Waste Disposal Costs | |||||
| Water Usage | $248,957 | 26,098 |
Tgal
|
$9.54 | |
| TOTAL YEARLY COSTS | $3,869,023 | ||||
| RECOMMENDED SAVINGS* | $873,109 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $863,034 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4224: Upgrade controls on compressors | $71,747 | $106,919 |
$71,747
1,024,952
kWh
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,755 | $21,512 |
$2,355
33,643
kWh
|
$1,400
-
kW-mo/yr
|
- | - | |
| 03 | 2.3212: Optimize plant power factor | $10,076 | $5,043 | - |
$10,076
-
kW-mo/yr
|
- | - | |
| 04 | 2.7425: Clean or color roof to reduce solar load | $49,000 | $83,421 |
$25,500
364,286
kWh
|
$23,500
-
kW-mo/yr
|
- | - | |
| 05 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $17,430 | $54,000 | - | - | - | $17,430 | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,102 | - |
$1,102
15,740
kWh
|
- | - | - | |
| 07 | 3.1191: Change procedures / equipment / operating conditions | $720,000 | $120,000 | - | - | $720,000 | - | |
| TOTAL RECOMMENDED | $873,109 | $390,894 |
$100,704
1,438,621
kWh
|
$34,975
-
kW-mo/yr
|
$720,000 | $17,430 | ||
| TOTAL IMPLEMENTED | $863,034 | $385,852 |
$100,704
1,438,621
kWh
|
$24,900
-
kW-mo/yr
|
$720,000 | $17,430 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs