ITAC Assessment: NL0050
ITAC logo
ITAC Assessment: NL0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 23
Plant Area 107,640
ft2
Annual Production 129,411
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,712 1,703,657
kWh
Electricity Demand $29,604 2,526
kW-mo/yr
Electricity Fees $4,769 -
Waste Disposal Costs
Water Usage $2,506 1,877
Tgal
Water Disposal $4,693 1,877
Tgal
TOTAL YEARLY COSTS $133,282
RECOMMENDED SAVINGS* $6,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,788

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 3.2172: Use automatic cleaning equipment $4,536 $22,386 - - $4,536
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,749 $5,975 $727
13,723
kWh
$825
-
kW-mo/yr
$197
03 2.6231: Utilize controls to operate equipment only when needed $328 $2,465 $328
6,561
kWh
- -
04 2.7492: Use proper thickness of insulation on building envelope $117 $388 $117
2,213
kWh
- -
05 2.2511: Insulate bare equipment $58 $280 $58
1,047
kWh
- -
TOTAL RECOMMENDED $6,788 $31,494 $1,230
23,544
kWh
$825
-
kW-mo/yr
$4,733
TOTAL IMPLEMENTED $6,788 $31,494 $1,230
23,544
kWh
$825
-
kW-mo/yr
$4,733
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs