ITAC Assessment: MA0227
ITAC logo
ITAC Assessment: MA0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COATED COPPER WIRE
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 312
Plant Area
n/a
Annual Production 175,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,476 3,422,040
kWh
Natural Gas $1,510 194
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3212: Optimize plant power factor $4,097 $12,000 $4,097
41,911
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,375 $1,566 $1,375
14,068
kWh
03 2.2511: Insulate bare equipment $974 $1,350 $974
9,965
kWh
TOTAL RECOMMENDED $6,446 $14,916 $6,446
65,944
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs