ITAC Assessment: NL0049
ITAC logo
ITAC Assessment: NL0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $50
M
to 100
M
# of Employees 245
Plant Area 256,750
ft2
Annual Production 8,000
units
Production Hrs. Annual 2,320
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,234 2,933,304
kWh
Electricity Demand $216,672 10,827
kW-mo/yr
Electricity Fees $361 -
Natural Gas $121,038 18,587
MMBtu
Waste Disposal Costs
Water Usage $4,533 1,210
Tgal
Water Disposal $3,631 1,210
Tgal
TOTAL YEARLY COSTS $496,469
RECOMMENDED SAVINGS* $59,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,245

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $27,083 $43,749 - - $27,083 - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $19,291 $28,235 $6,073
119,086
kWh
$12,308
-
kW-mo/yr
- - $910 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,662 $4,000 $5,329
104,495
kWh
- - - $(-1,417.0) $(-250.0) -
04 2.8114: Change rate schedules or other changes in utility service $3,390 $90 - - - - - - $3,390
05 2.8117: Install sub-metering equipment $2,954 $354 - - - $2,954
-
Tgal
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,894 $2,550 $1,894
37,145
kWh
- - - - - -
07 2.2511: Insulate bare equipment $1,475 $460 $374
7,339
kWh
$1,101
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $59,749 $79,438 $13,670
268,065
kWh
$13,409
-
kW-mo/yr
$27,083 $2,954
-
Tgal
$(-507.0) $(-250.0) $3,390
TOTAL IMPLEMENTED $22,245 $28,589 $6,073
119,086
kWh
$12,308
-
kW-mo/yr
- $2,954
-
Tgal
$910 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs