Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Direct Mail
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 125,000
ft2
Annual Production 90,000,000
units
Production Hrs. Annual 5,187
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,540 1,660,940
kWh
Electricity Demand $101,172 6,790
kW-mo/yr
Electricity Fees $8,474 -
Natural Gas $28,322 4,131
MMBtu
Fuel Oil #2 $2,848 139
MMBtu
Waste Disposal Costs
Water Usage $1,047 567
Tgal
Water Disposal $1,449 567
Tgal
TOTAL YEARLY COSTS $200,852
RECOMMENDED SAVINGS* $20,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,444

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7271: Replace electric reheat with heat pipes $5,384 $20,000 $2,328
66,496
kWh
$3,056
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,816 $3,372 $1,928
55,101
kWh
$1,125
-
kW-mo/yr
- $763 - - -
03 2.7243: Improve air circulation with destratification fans / other methods $3,717 $5,000 $(-183.1)
(-5,230)
kWh
- - - - - $3,900
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,153 $3,266 $883
25,219
kWh
$869
-
kW-mo/yr
- $1,401 - - -
05 4.512: Condense operation into one building $2,848 $9,480 - - $2,848
-
MMBtu
- - - -
06 2.6127: Maintain air filters by cleaning or replacement $495 $44 - - - - $495 - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $425 $2,064 $268
7,666
kWh
$156
-
kW-mo/yr
- - - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $288 $1,600 $740
20,265
kWh
- - $(-352.0) - $(-100.0) -
09 2.4221: Install compressor air intakes in coolest locations $220 $525 $220
6,273
kWh
- - - - - -
10 2.7135: Install occupancy sensors $98 $298 $98
2,801
kWh
- - - - - -
TOTAL RECOMMENDED $20,444 $45,649 $6,282
178,591
kWh
$5,207
-
kW-mo/yr
$2,848
-
MMBtu
$1,812 $495 $(-100.0) $3,900
TOTAL IMPLEMENTED $20,444 $45,649 $6,282
178,591
kWh
$5,207
-
kW-mo/yr
$2,848
-
MMBtu
$1,812 $495 $(-100.0) $3,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs