Assessment Year | 2013 |
---|---|
Principal Product | Insulation Material |
NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 42 |
Plant Area |
60,000
ft2
|
Annual Production | 62,000
thousand feet
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $68,290 | 1,320,540 |
kWh
|
$0.052 |
Electricity Demand | $57,662 | 5,540 |
kW-mo/yr
|
$10.41 |
Electricity Fees | $22,304 | - |
|
- |
Natural Gas | $71,654 | 13,058 |
MMBtu
|
$5.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,049 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,931 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $25,326 | $3,900 |
$19,864
381,993
kWh
|
$5,462
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,636 | $1,660 |
$13,231
254,440
kWh
|
$405
-
kW-mo/yr
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $7,559 | $2,200 |
$4,266
82,031
kWh
|
$3,293
-
kW-mo/yr
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $4,256 | $80 |
$2,403
46,206
kWh
|
$1,853
-
kW-mo/yr
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,052 | $2,520 | - | - |
$3,052
-
MMBtu
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,828 | $80 |
$1,027
19,757
kWh
|
$1,801
-
kW-mo/yr
|
- | |
07 | 2.7145: Install skylights | $2,274 | $5,665 |
$1,285
24,711
kWh
|
$989
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,852 | $5,600 |
$1,195
22,976
kWh
|
$657
-
kW-mo/yr
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,490 | $2,460 |
$842
16,198
kWh
|
$648
-
kW-mo/yr
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,327 | $4,510 |
$750
14,414
kWh
|
$577
-
kW-mo/yr
|
- | |
11 | 2.7135: Install occupancy sensors | $449 | $330 |
$251
4,823
kWh
|
$198
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $64,049 | $29,005 |
$45,114
867,549
kWh
|
$15,883
-
kW-mo/yr
|
$3,052
-
MMBtu
|
||
TOTAL IMPLEMENTED | $58,931 | $16,105 |
$42,076
809,138
kWh
|
$13,803
-
kW-mo/yr
|
$3,052
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs