ITAC Assessment: NL0034
ITAC logo
ITAC Assessment: NL0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bottled Water Equipment
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 115,000
ft2
Annual Production 1,100
units
Production Hrs. Annual 2,730
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,495 850,360
kWh
Electricity Demand $51,858 4,086
kW-mo/yr
Natural Gas $16,458 1,269
MMBtu
Waste Disposal Costs
Water Usage $6,043 1,977
Tgal
Water Disposal $6,063 1,977
Tgal
TOTAL YEARLY COSTS $110,917
RECOMMENDED SAVINGS* $24,406 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,124

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,764 $8,337 $4,173
115,905
kWh
$7,592
-
kW-mo/yr
- - - -
02 2.7243: Improve air circulation with destratification fans / other methods $9,862 $11,390 $(-190.3)
(-5,286)
kWh
$(-448.0)
-
kW-mo/yr
- - - $10,500
03 2.7135: Install occupancy sensors $1,679 $4,388 $594
16,584
kWh
$1,085
-
kW-mo/yr
- - - -
04 2.8114: Change rate schedules or other changes in utility service $493 - - - $493
-
Tgal
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $248 - $248
6,924
kWh
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $238 $500 $438
12,182
kWh
- - $(-100.0) $(-100.0) -
07 2.4221: Install compressor air intakes in coolest locations $122 $275 $122
3,393
kWh
- - - - -
TOTAL RECOMMENDED $24,406 $24,890 $5,384
149,702
kWh
$8,229
-
kW-mo/yr
$493
-
Tgal
$(-100.0) $(-100.0) $10,500
TOTAL IMPLEMENTED $12,124 $9,112 $4,733
131,480
kWh
$7,592
-
kW-mo/yr
- $(-100.0) $(-100.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings