ITAC Assessment: NL0030
ITAC logo
ITAC Assessment: NL0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 13
Plant Area 180,000
ft2
Annual Production 12,410,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,603 1,506,400
kWh
Electricity Demand $49,740 3,322
kW-mo/yr
Natural Gas $28,578 4,702
MMBtu
TOTAL YEARLY COSTS $140,921
RECOMMENDED SAVINGS* $17,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 3.3128: Utilize other methods to remove contaminants $12,000 $102,830 - - - $12,000
02 2.7447: Install vinyl strip / high speed / air curtain doors $5,716 $22,557 - - $5,716
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $119 $421 $28
663
kWh
$92
-
kW-mo/yr
- -
TOTAL RECOMMENDED $17,835 $125,808 $28
663
kWh
$92
-
kW-mo/yr
$5,716
-
MMBtu
$12,000
TOTAL IMPLEMENTED $5,835 $22,978 $28
663
kWh
$92
-
kW-mo/yr
$5,716
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs