ITAC Assessment: NL0014
ITAC logo
ITAC Assessment: NL0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Injection Molded Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 80,000
ft2
Annual Production 612,500,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $317,795 12,400,000
kWh
Electricity Demand $506,923 24,775
kW-mo/yr
Electricity Fees $45,156 -
Waste Disposal Costs
Water Usage $8,934 799,600
Tgal
Water Disposal $13,408 742
Tgal
TOTAL YEARLY COSTS $892,217
RECOMMENDED SAVINGS* $22,794 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7261: Install timers and/or thermostats $9,200 $1,630 $9,200
323,000
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,430 $12,500 $3,072
120,000
kWh
$4,358
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,100 - $4,700
183,000
kWh
- $(-600.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,804 $2,500 $553
21,580
kWh
$1,251
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $260 $225 $260
10,156
kWh
- -
TOTAL RECOMMENDED $22,794 $16,855 $17,785
657,736
kWh
$5,609
-
kW-mo/yr
$(-600.0)
TOTAL IMPLEMENTED $22,534 $16,630 $17,525
647,580
kWh
$5,609
-
kW-mo/yr
$(-600.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs