ITAC Assessment: NL0009
ITAC logo
ITAC Assessment: NL0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Grain and Field Beans
NAICS 424510: Grain and Field Bean Merchant Wholesalers
SIC 5153: Grain and Field Beans
Sales Range $10
M
to 50
M
# of Employees 21
Plant Area 312,600
ft2
Annual Production 33,000,000
bushels
Production Hrs. Annual 3,150
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,296 1,995,380
kWh
Electricity Demand $111,576 11,158
kW-mo/yr
Natural Gas $45,995 5,337
MMBtu
Waste Disposal Costs
Water Usage $1,359 443
Tgal
Solid Waste (non-haz) $3,500 480,000
lb
TOTAL YEARLY COSTS $293,726
RECOMMENDED SAVINGS* $50,275 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,323

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.5194: Redesign process $37,689 $38,000 $102
1,554
kWh
$2,487
-
kW-mo/yr
$35,100
02 2.6231: Utilize controls to operate equipment only when needed $10,263 $10,000 $10,263
155,963
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,632 $4,788 $736
11,190
kWh
$896
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $691 $3,360 $691
10,500
kWh
- -
TOTAL RECOMMENDED $50,275 $56,148 $11,792
179,207
kWh
$3,383
-
kW-mo/yr
$35,100
TOTAL IMPLEMENTED $2,323 $8,148 $1,427
21,690
kWh
$896
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs