ITAC Assessment: NL0004
ITAC logo
ITAC Assessment: NL0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Wood, Metal, Fiberglass
NAICS 321113: Sawmills
SIC 2491: Wood Preserving
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 500,000
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,996 4,620,824
kWh
Electricity Demand $16,563 1,198
kW-mo/yr
Natural Gas $93,720 40,704
MMBtu
Waste Disposal Costs
Water Usage $30,000 6,000
Tgal
Solid Waste (non-haz) $6,750 300,000
lb
TOTAL YEARLY COSTS $362,029
RECOMMENDED SAVINGS* $200,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $200,115

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
01 2.1221: Replace obsolete burners with more efficient ones $93,000 $125,000 $35,000
750,000
kWh
$58,000
-
kW-mo/yr
- - -
02 2.4322: Use or replace with energy efficient substitutes $65,107 $300,000 $(-4,450.0)
(-95,905)
kWh
- $39,427
-
MMBtu
$6,750
-
lb
$23,380
03 2.6213: Turn off steam / hot water lines leading to space heating units $30,789 $30,000 - - $30,789
-
MMBtu
- -
04 2.4223: Install direct acting units in place of compressed air pressure system in safety system $6,396 $1,100 $6,396
138,600
kWh
- - - -
05 2.2514: Cover open tanks $4,000 $5,200 - - $4,000
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $823 $2,300 $823
18,000
kWh
- - - -
TOTAL RECOMMENDED $200,115 $463,600 $37,769
810,695
kWh
$58,000
-
kW-mo/yr
$74,216
-
MMBtu
$6,750
-
lb
$23,380
TOTAL IMPLEMENTED $200,115 $463,600 $37,769
810,695
kWh
$58,000
-
kW-mo/yr
$74,216
-
MMBtu
$6,750
-
lb
$23,380
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs