ITAC Assessment: UM0260
ITAC logo
ITAC Assessment: UM0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Fuel and Brake Systems
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 179
Plant Area 57,000
ft2
Annual Production 1,750,000
pieces
Production Hrs. Annual 4,128
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,096 1,835,600
kWh
Electricity Demand $89,393 7,106
kW-mo/yr
Electricity Fees $9,241 -
Natural Gas $15,596 2,049
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,405

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.3191: Use demand controller or load shedder $38,413 $10,000 - $35,325
-
kW-mo/yr
- $3,088 - -
02 3.4111: Use closed cycle process to minimize waste water production $33,620 $12,000 $(-182.0)
3,096
kWh
$(-113.0)
-
kW-mo/yr
- - $(-12.0) $33,927
-
Tgal
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,181 $13,690 $4,246
73,463
kWh
$3,935
-
kW-mo/yr
- - - -
04 2.2437: Recover waste heat from equipment $4,671 $1,000 - - $4,671
-
MMBtu
- - -
05 2.4239: Eliminate or reduce compressed air usage $2,831 $2,000 $1,734
30,000
kWh
$1,097
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,283 $1,050 $1,398
24,195
kWh
$885
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $1,054 $1,564 $1,054
18,231
kWh
- - - - -
TOTAL RECOMMENDED $91,053 $41,304 $8,250
148,985
kWh
$41,129
-
kW-mo/yr
$4,671
-
MMBtu
$3,088 $(-12.0) $33,927
-
Tgal
TOTAL IMPLEMENTED $43,405 $16,050 $2,950
57,291
kWh
$1,869
-
kW-mo/yr
$4,671
-
MMBtu
- $(-12.0) $33,927
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs