ITAC Assessment: ND0365
ITAC logo
ITAC Assessment: ND0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Laminated Wood Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 178,000
ft2
Annual Production 6,400
thousand feet
Production Hrs. Annual 3,640
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,152 1,465,709
kWh
Electricity Demand $39,100 9,161
kW-mo/yr
Electricity Fees $3,656 -
Natural Gas $20,283 3,663
MMBtu
LPG $13,056 1,266
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,269 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $897

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8226: Increase efficiency of trucks $3,969 $28,000 $(-1,066.0)
(-22,567)
kWh
$(-320.0)
-
kW-mo/yr
- $(-7,701.0)
-
MMBtu
$13,056
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $897 $120 $897
19,050
kWh
- - - - - -
03 2.2437: Recover waste heat from equipment $883 $500 - - - $883
-
MMBtu
- - -
04 2.4221: Install compressor air intakes in coolest locations $430 $400 $329
7,327
kWh
$101
-
kW-mo/yr
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $271 $400 $113
2,345
kWh
$14
-
kW-mo/yr
- - - $70 $74
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $216 $200 $194
4,103
kWh
$118
-
kW-mo/yr
- $(-96.0)
-
MMBtu
- - -
07 2.8121: Apply for tax-free status for energy purchases $3,656 $250 - - $3,656 - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $332 $1,000 $231
4,982
kWh
$101
-
kW-mo/yr
- - - - -
09 2.4221: Install compressor air intakes in coolest locations $187 $350 $130
2,638
kWh
$57
-
kW-mo/yr
- - - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $428 $2,569 $292
6,155
kWh
$136
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $11,269 $33,789 $1,120
24,033
kWh
$207
-
kW-mo/yr
$3,656 $(-6,914.0)
-
MMBtu
$13,056
-
MMBtu
$70 $74
TOTAL IMPLEMENTED $897 $120 $897
19,050
kWh
- - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs