ITAC Assessment: LM0101
ITAC logo
ITAC Assessment: LM0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product air frame fasteners
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 360
Plant Area 124,000
ft2
Annual Production 98,760,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $851,177 11,087,326
kWh
Electricity Demand $384,949 28,692
kW-mo/yr
Electricity Fees $149,429 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $237,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $12,671 - $8,210
101,568
kWh
$4,461
-
kW-mo/yr
-
02 4.122: Develop standard procedures to improve internal yields $200,454 $75,500 - - $200,454
03 2.4133: Use most efficient type of electric motors $1,320 $1,178 $658
8,140
kWh
$662
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,490 $18,642 $6,797
84,084
kWh
$3,693
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $12,390 $1,225 $8,029
99,320
kWh
$4,361
-
kW-mo/yr
-
TOTAL RECOMMENDED $237,325 $96,545 $23,694
293,112
kWh
$13,177
-
kW-mo/yr
$200,454
TOTAL IMPLEMENTED $22,880 $19,867 $14,826
183,404
kWh
$8,054
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs