Assessment Year | 1995 |
---|---|
Principal Product | Blow Molded Plastics |
NAICS |
n/a
|
SIC | 3085: Plastics Bottles |
Sales Range | $5 M to 10M |
# of Employees | 108 |
Plant Area |
92,000
ft2
|
Annual Production | 30,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $729,026 | 17,055,686 |
kWh
|
$0.043 |
Natural Gas | $26,073 | 4,904 |
MMBtu
|
$5.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $92,552 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,346 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $149 | $292 |
$149
3,224
kWh
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $16,902 | $30,410 |
$16,902
379,836
kWh
|
- | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,940 | $10,000 |
$3,940
123,681
kWh
|
- | |
04 | 2.3113: Make ice during off peak hours for cooling | $19,158 | $80,000 |
$19,158
-
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,618 | $2,500 |
$1,618
36,342
kWh
|
- | |
06 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $20,246 | $4,000 |
$246
5,275
kWh
|
$20,000
-
MMBtu
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,975 | $240 |
$11,975
269,050
kWh
|
- | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $13,702 | - |
$13,702
-
kWh
|
- | |
09 | 2.2511: Insulate bare equipment | $4,862 | $1,500 |
$4,862
109,320
kWh
|
- | |
TOTAL RECOMMENDED | $92,552 | $128,942 |
$72,552
926,728
kWh
|
$20,000
-
MMBtu
|
||
TOTAL IMPLEMENTED | $44,346 | $33,442 |
$44,346
688,452
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs