ITAC Assessment: ND0362
ITAC logo
ITAC Assessment: ND0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product injection manifolds and liquid reservoirs
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 120,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,568
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,150 7,229,191
kWh
Electricity Demand $130,843 13,830
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,613 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,985

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $17,460 $200 $6,758
188,453
kWh
$12,487
-
kW-mo/yr
- $(-1,785.0) -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $76 $150 $27
879
kWh
$9
-
kW-mo/yr
- - $40
03 2.7135: Install occupancy sensors $460 $200 $336
9,379
kWh
$124
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $1,647 $1,000 $1,390
38,687
kWh
$257
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $491 $40 $491
13,775
kWh
- - - -
06 3.4151: Minimize water usage $445 $1,330 - - $445
-
Tgal
- -
07 4.611: Begin a practice of predictive / preventative maintenance $1,034 - - - - $1,034 -
TOTAL RECOMMENDED $21,613 $2,920 $9,002
251,173
kWh
$12,877
-
kW-mo/yr
$445
-
Tgal
$(-751.0) $40
TOTAL IMPLEMENTED $18,985 $240 $7,249
202,228
kWh
$12,487
-
kW-mo/yr
- $(-751.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs