ITAC Assessment: ND0359
ITAC logo
ITAC Assessment: ND0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Engine & Transmission Parts
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 50,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 2,288
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,824 2,527,843
kWh
Electricity Demand $53,368 4,963
kW-mo/yr
Electricity Fees $6,696 -
Natural Gas $8,884 1,646
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,626 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $858 $195 $858
29,015
kWh
- - -
02 2.4151: Develop a repair/replace policy $4,437 $17,206 $2,971
78,546
kWh
$1,466
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $207 $280 $96
2,052
kWh
$31
-
kW-mo/yr
- $80
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,477 $8,551 $536
18,171
kWh
$941
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $721 $800 $600
13,482
kWh
$121
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $879 $614 - - $879 -
07 2.8112: Combine utility meters $8,059 $40,000 - - $8,059 -
08 4.821: Pay bills on time to avoid late fees $408 - - - $408 -
09 4.811: Demolish old building to reduce tax and insurance bills $5,580 $250 - - $5,580 -
TOTAL RECOMMENDED $22,626 $67,896 $5,061
141,266
kWh
$2,559
-
kW-mo/yr
$14,926 $80
TOTAL IMPLEMENTED $8,530 $9,276 $1,490
49,238
kWh
$972
-
kW-mo/yr
$5,988 $80
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs