ITAC Assessment: ND0340
ITAC logo
ITAC Assessment: ND0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Coil Winding machines
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 31,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 2,295
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,357 532,239
kWh
Electricity Demand $9,889 2,317
kW-mo/yr
LPG $5,674 903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $349

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $9,628 - $1,777
36,049
kWh
$416
-
kW-mo/yr
- - $7,435
02 2.7124: Make a practice of turning off lights when not needed $329 $240 $222
4,396
kWh
$107
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $297 $40 $173
3,517
kWh
$79
-
kW-mo/yr
- $45 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $351 $510 $158
3,224
kWh
$19
-
kW-mo/yr
- $174 -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $134 $500 - - $134
-
lb
- -
06 2.3132: Recharge batteries on during off-peak demand periods $20 - - $20
-
kW-mo/yr
- - -
07 2.4151: Develop a repair/replace policy $151 $677 $102
2,052
kWh
$49
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $10,910 $1,967 $2,432
49,238
kWh
$690
-
kW-mo/yr
$134
-
lb
$219 $7,435
TOTAL IMPLEMENTED $349 $240 $222
4,396
kWh
$127
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs