ITAC Assessment: SF0567
ITAC logo
ITAC Assessment: SF0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Machined Parts for various applications
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 81,500
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $383,040 3,270,186
kWh
Electricity Demand $235,316 7,167
kW-mo/yr
Electricity Fees $5,484 -
Natural Gas $8,389 592
MMBtu
TOTAL YEARLY COSTS $632,229
RECOMMENDED SAVINGS* $83,038 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,977

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.6218: Turn off equipment when not in use $20,821 - $20,821
185,406
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,911 - $9,511
84,690
kWh
- $(-1,600.0) - -
03 2.4239: Eliminate or reduce compressed air usage $9,406 $3,350 $9,406
83,761
kWh
- - - -
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $24,340 $29,296 $24,340
216,750
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $16,660 $40,195 $8,591
76,497
kWh
$6,910
-
kW-mo/yr
$28 $1,131 -
06 3.5217: Reuse / recycle/ sell paper products $3,900 - - - - - $3,900
TOTAL RECOMMENDED $83,038 $72,841 $72,669
647,104
kWh
$6,910
-
kW-mo/yr
$(-1,572.0) $1,131 $3,900
TOTAL IMPLEMENTED $33,977 $43,545 $27,508
244,948
kWh
$6,910
-
kW-mo/yr
$(-1,572.0) $1,131 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs