Assessment Year | 1999 |
---|---|
Principal Product | Wood Moldings |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $1 M to 5M |
# of Employees | 56 |
Plant Area |
85,000
ft2
|
Annual Production | 2,100,000
thousand feet
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,387 | 1,173,798 |
kWh
|
$0.071 |
Electricity Demand | $30,328 | 2,895 |
kW-mo/yr
|
$10.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,477 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,477 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4151: Develop a repair/replace policy | $13,184 | $31,164 |
$5,296
76,202
kWh
|
$3,634
-
kW-mo/yr
|
$4,254 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,904 | $9,101 |
$1,825
31,360
kWh
|
$1,512
-
kW-mo/yr
|
$1,567 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $511 | $1,603 |
$281
4,396
kWh
|
$230
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $477 | $430 |
$297
3,810
kWh
|
$33
-
kW-mo/yr
|
- | $147 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $272 | $120 |
$272
3,224
kWh
|
- | - | - | |
06 | 2.2211: Use optimum temperature | $78 | $10 |
$78
1,758
kWh
|
- | - | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $51 | $50 |
$51
879
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $19,477 | $42,478 |
$8,100
121,629
kWh
|
$5,409
-
kW-mo/yr
|
$5,821 | $147 | ||
TOTAL IMPLEMENTED | $19,477 | $42,478 |
$8,100
121,629
kWh
|
$5,409
-
kW-mo/yr
|
$5,821 | $147 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs