ITAC Assessment: ND0335
ITAC logo
ITAC Assessment: ND0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Wood Moldings
NAICS
n/a
SIC 2431: Millwork
Sales Range $1
M
to 5
M
# of Employees 56
Plant Area 85,000
ft2
Annual Production 2,100,000
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,387 1,173,798
kWh
Electricity Demand $30,328 2,895
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,477 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,477

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4151: Develop a repair/replace policy $13,184 $31,164 $5,296
76,202
kWh
$3,634
-
kW-mo/yr
$4,254 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,904 $9,101 $1,825
31,360
kWh
$1,512
-
kW-mo/yr
$1,567 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $511 $1,603 $281
4,396
kWh
$230
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $477 $430 $297
3,810
kWh
$33
-
kW-mo/yr
- $147
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $272 $120 $272
3,224
kWh
- - -
06 2.2211: Use optimum temperature $78 $10 $78
1,758
kWh
- - -
07 2.4239: Eliminate or reduce compressed air usage $51 $50 $51
879
kWh
- - -
TOTAL RECOMMENDED $19,477 $42,478 $8,100
121,629
kWh
$5,409
-
kW-mo/yr
$5,821 $147
TOTAL IMPLEMENTED $19,477 $42,478 $8,100
121,629
kWh
$5,409
-
kW-mo/yr
$5,821 $147
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs