Assessment Year | 2007 |
---|---|
Principal Product | Fabricated modular skids for petroleum chemical industry |
NAICS | 332313: Plate Work Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $100 M to 500M |
# of Employees | 175 |
Plant Area |
161,000
ft2
|
Annual Production | 50
pieces
|
Production Hrs. Annual | 5,720
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $271,098 | 3,473,440 |
kWh
|
$0.078 |
Natural Gas | $160,731 | 16,388 |
MMBtu
|
$9.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,157 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,427 | $8,720 |
$2,427
30,723
kWh
|
- | - | |
02 | 2.7231: Use radiant heater for spot heating | $34,603 | $3,729 | - | - |
$34,603
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,080 | $360 |
$4,080
54,180
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,247 | $2,398 |
$4,247
53,766
kWh
|
- | - | |
05 | 4.611: Begin a practice of predictive / preventative maintenance | $800 | - | - | $800 | - | |
TOTAL RECOMMENDED | $46,157 | $15,207 |
$10,754
138,669
kWh
|
$800 |
$34,603
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs