ITAC Assessment: OK0744
ITAC logo
ITAC Assessment: OK0744
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Fabricated modular skids for petroleum chemical industry
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $100
M
to 500
M
# of Employees 175
Plant Area 161,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 5,720
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,098 3,473,440
kWh
Natural Gas $160,731 16,388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,427 $8,720 $2,427
30,723
kWh
- -
02 2.7231: Use radiant heater for spot heating $34,603 $3,729 - - $34,603
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,080 $360 $4,080
54,180
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,247 $2,398 $4,247
53,766
kWh
- -
05 4.611: Begin a practice of predictive / preventative maintenance $800 - - $800 -
TOTAL RECOMMENDED $46,157 $15,207 $10,754
138,669
kWh
$800 $34,603
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs