ITAC Assessment: ME0264
ITAC logo
ITAC Assessment: ME0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product diaphrams
NAICS
n/a
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 134,364
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 6,604
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,538 5,477,140
kWh
Electricity Demand $97,444 13,175
kW-mo/yr
Electricity Fees $3,145 -
LPG $47,406 10,063
MMBtu
Fuel Oil #2 $19,861 5,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,001 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,149 $1,000 $11,149
139,215
kWh
- - - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,088 $2,500 $4,080
50,996
kWh
$3,030
-
kW-mo/yr
$(-1,022.0)
-
MMBtu
- - -
03 2.2515: Use optimum thickness insulation $3,286 $613 $3,286
35,463
kWh
- - - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,025 $4,646 $2,483
31,067
kWh
$1,204
-
kW-mo/yr
$(-662.0)
-
MMBtu
- - -
05 4.632: Change operating conditions $2,720 $950 - - - - - $2,720
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,054 $3,010 $787
9,965
kWh
$267
-
kW-mo/yr
- - - -
07 4.821: Pay bills on time to avoid late fees $615 - - - - - - $615
08 4.231: Purchase equipment instead of leasing $593 $1,340 - - - - - $593
09 2.2511: Insulate bare equipment $296 $343 - - - $296
-
MMBtu
- -
10 2.2511: Insulate bare equipment $235 $437 - - - $235
-
MMBtu
- -
11 3.1192: Reduce scrap production $17,940 - - - - - $17,940
-
lb
-
TOTAL RECOMMENDED $47,001 $14,839 $21,785
266,706
kWh
$4,501
-
kW-mo/yr
$(-1,684.0)
-
MMBtu
$531
-
MMBtu
$17,940
-
lb
$3,928
TOTAL IMPLEMENTED $11,149 $1,000 $11,149
139,215
kWh
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs