| Assessment Year | 1999 |
|---|---|
| Principal Product | diaphrams |
| NAICS |
n/a
|
| SIC | 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
134,364
ft2
|
| Annual Production | 3,000
pieces
|
| Production Hrs. Annual | 6,604
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $435,538 | 5,477,140 |
kWh
|
$0.080 |
| Electricity Demand | $97,444 | 13,175 |
kW-mo/yr
|
$7.40 |
| Electricity Fees | $3,145 | - |
|
- |
| LPG | $47,406 | 10,063 |
MMBtu
|
$4.71 |
| Fuel Oil #2 | $19,861 | 5,810 |
MMBtu
|
$3.42 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,001 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,149 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,149 | $1,000 |
$11,149
139,215
kWh
|
- | - | - | - | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,088 | $2,500 |
$4,080
50,996
kWh
|
$3,030
-
kW-mo/yr
|
$(-1,022.0)
-
MMBtu
|
- | - | - | |
| 03 | 2.2515: Use optimum thickness insulation | $3,286 | $613 |
$3,286
35,463
kWh
|
- | - | - | - | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,025 | $4,646 |
$2,483
31,067
kWh
|
$1,204
-
kW-mo/yr
|
$(-662.0)
-
MMBtu
|
- | - | - | |
| 05 | 4.632: Change operating conditions | $2,720 | $950 | - | - | - | - | - | $2,720 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,054 | $3,010 |
$787
9,965
kWh
|
$267
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 4.821: Pay bills on time to avoid late fees | $615 | - | - | - | - | - | - | $615 | |
| 08 | 4.231: Purchase equipment instead of leasing | $593 | $1,340 | - | - | - | - | - | $593 | |
| 09 | 2.2511: Insulate bare equipment | $296 | $343 | - | - | - |
$296
-
MMBtu
|
- | - | |
| 10 | 2.2511: Insulate bare equipment | $235 | $437 | - | - | - |
$235
-
MMBtu
|
- | - | |
| 11 | 3.1192: Reduce scrap production | $17,940 | - | - | - | - | - |
$17,940
-
lb
|
- | |
| TOTAL RECOMMENDED | $47,001 | $14,839 |
$21,785
266,706
kWh
|
$4,501
-
kW-mo/yr
|
$(-1,684.0)
-
MMBtu
|
$531
-
MMBtu
|
$17,940
-
lb
|
$3,928 | ||
| TOTAL IMPLEMENTED | $11,149 | $1,000 |
$11,149
139,215
kWh
|
- | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs