ITAC Assessment: ND0332
ITAC logo
ITAC Assessment: ND0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Vitreous china plumbing fixtures
NAICS
n/a
SIC 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories
Sales Range $10
M
to 50
M
# of Employees 203
Plant Area 500,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,795 8,621,044
kWh
Electricity Demand $183,079 16,541
kW-mo/yr
Natural Gas $649,748 187,783
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,942

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,688 $750 $979
56,565
kWh
$1,709
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,197 $7,544 $1,112
64,185
kWh
$1,942
-
kW-mo/yr
- $(-20.0) $163
03 2.7124: Make a practice of turning off lights when not needed $117 $40 $27
1,465
kWh
$90
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $(-61.0) $1,560 $102
5,862
kWh
$90
-
kW-mo/yr
- $(-463.0) $210
05 2.4221: Install compressor air intakes in coolest locations $2,668 $500 $733
42,204
kWh
$1,935
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,580 $480 $1,580
91,149
kWh
- - - -
07 2.2437: Recover waste heat from equipment $2,577 $1,200 - - $2,577
-
MMBtu
- -
08 4.611: Begin a practice of predictive / preventative maintenance $721 $1,334 - - - $721 -
TOTAL RECOMMENDED $13,487 $13,408 $4,533
261,430
kWh
$5,766
-
kW-mo/yr
$2,577
-
MMBtu
$238 $373
TOTAL IMPLEMENTED $6,942 $2,220 $2,340
134,818
kWh
$2,025
-
kW-mo/yr
$2,577
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs