ITAC Assessment: ND0329
ITAC logo
ITAC Assessment: ND0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fire Fighting Nozzles
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 80,000
ft2
Annual Production 2,500
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,953 1,331,770
kWh
Electricity Demand $31,363 3,828
kW-mo/yr
Natural Gas $4,061 718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 4.521: Clear and rent existing space $40,000 $18,000 - - - - - $40,000 -
02 2.4133: Use most efficient type of electric motors $720 $7,006 $621
5,862
kWh
$99
-
kW-mo/yr
- - - - -
03 2.4226: Use / purchase optimum sized compressor $2,442 $5,000 $2,442
44,549
kWh
- - - - - -
04 2.4221: Install compressor air intakes in coolest locations $1,236 $1,500 $1,236
21,981
kWh
- - - - - -
05 2.7111: Reduce illumination to minimum necessary levels $1,296 $300 $898
16,413
kWh
$398
-
kW-mo/yr
- - - - -
06 3.4151: Minimize water usage $870 $1,400 - - - $870
-
Tgal
- - -
07 3.4151: Minimize water usage $878 $2,300 - - - $755
-
Tgal
$200 - $(-77.0)
08 4.811: Demolish old building to reduce tax and insurance bills $658 $250 - - $658 - - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $587 $100 $587
10,844
kWh
- - - - - -
10 4.611: Begin a practice of predictive / preventative maintenance $181 $390 - - - - $181 - -
TOTAL RECOMMENDED $48,868 $36,246 $5,784
99,649
kWh
$497
-
kW-mo/yr
$658 $1,625
-
Tgal
$381 $40,000 $(-77.0)
TOTAL IMPLEMENTED $40,768 $18,490 $587
10,844
kWh
- - - $181 $40,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs