Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Teflon Products
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 28,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Demand $38,122 4,506
kW-mo/yr
Electricity Fees $5,978 -
Natural Gas $4,972 870
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,537 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,925

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,589 $40,800 $14,449
440,797
kWh
$3,022
-
kW-mo/yr
- $(-9,882.0)
-
MMBtu
- - -
02 4.811: Demolish old building to reduce tax and insurance bills $3,731 $250 - - $3,731 - - - -
03 4.821: Pay bills on time to avoid late fees $2,584 - - - $2,451 $133
-
MMBtu
- - -
04 4.222: Purchase re-conditioned material instead of new $546 $991 $297
9,086
kWh
$181
-
kW-mo/yr
- - - - $68
05 2.4226: Use / purchase optimum sized compressor $1,064 $500 $1,064
32,532
kWh
- - - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $736 $1,746 $403
12,309
kWh
$333
-
kW-mo/yr
- - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $670 $140 $427
12,896
kWh
$243
-
kW-mo/yr
- - - - -
08 2.7135: Install occupancy sensors $256 $600 $163
4,982
kWh
$93
-
kW-mo/yr
- - - - -
09 3.8211: Convert to aqueous cleaning system $114 $100 - - - - $114
-
gal
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $109 $360 $40
1,172
kWh
$16
-
kW-mo/yr
- - - $53 -
11 2.4221: Install compressor air intakes in coolest locations $106 $200 $106
3,224
kWh
- - - - - -
12 2.2211: Use optimum temperature $32 $10 - - - $32
-
MMBtu
- - -
TOTAL RECOMMENDED $17,537 $45,697 $16,949
516,998
kWh
$3,888
-
kW-mo/yr
$6,182 $(-9,717.0)
-
MMBtu
$114
-
gal
$53 $68
TOTAL IMPLEMENTED $7,925 $2,191 $993
30,188
kWh
$517
-
kW-mo/yr
$6,182 $165
-
MMBtu
- - $68
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings