ITAC Assessment: ND0317
ITAC logo
ITAC Assessment: ND0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Canned Soft Drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 136
Plant Area 351,400
ft2
Annual Production 624,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $449,275 7,872,802
kWh
Electricity Demand $204,405 20,309
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,525 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,051 $1,500 $418
7,327
kWh
$101
-
kW-mo/yr
- - $532
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,579 $7,583 $997
17,585
kWh
$582
-
kW-mo/yr
- - -
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $273 $60 $273
3,224
kWh
- - - -
04 2.7135: Install occupancy sensors $826 $1,200 $548
9,672
kWh
$278
-
kW-mo/yr
- - -
05 2.7111: Reduce illumination to minimum necessary levels $6,479 $7,733 $5,165
90,563
kWh
$1,314
-
kW-mo/yr
- - -
06 2.7124: Make a practice of turning off lights when not needed $1,285 $260 $852
14,947
kWh
$433
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $4,474 $1,800 $3,071
53,927
kWh
$1,403
-
kW-mo/yr
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $146 $70 $97
1,758
kWh
$49
-
kW-mo/yr
- - -
09 2.8121: Apply for tax-free status for energy purchases $984 $250 - - - $984 -
10 2.2437: Recover waste heat from equipment $2,450 $11,000 - - $2,450
-
MMBtu
- -
11 2.2437: Recover waste heat from equipment $1,978 $3,150 - - $1,978
-
MMBtu
- -
TOTAL RECOMMENDED $21,525 $34,606 $11,421
199,003
kWh
$4,160
-
kW-mo/yr
$4,428
-
MMBtu
$984 $532
TOTAL IMPLEMENTED $8,183 $8,123 $6,387
110,492
kWh
$1,796
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs