| Assessment Year | 1999 |
|---|---|
| Principal Product | Canned Soft Drinks |
| NAICS |
n/a
|
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $100 M to 500M |
| # of Employees | 136 |
| Plant Area |
351,400
ft2
|
| Annual Production | 624,000,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $449,275 | 7,872,802 |
kWh
|
$0.057 |
| Electricity Demand | $204,405 | 20,309 |
kW-mo/yr
|
$10.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,525 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,183 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,051 | $1,500 |
$418
7,327
kWh
|
$101
-
kW-mo/yr
|
- | - | $532 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,579 | $7,583 |
$997
17,585
kWh
|
$582
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $273 | $60 |
$273
3,224
kWh
|
- | - | - | - | |
| 04 | 2.7135: Install occupancy sensors | $826 | $1,200 |
$548
9,672
kWh
|
$278
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $6,479 | $7,733 |
$5,165
90,563
kWh
|
$1,314
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7124: Make a practice of turning off lights when not needed | $1,285 | $260 |
$852
14,947
kWh
|
$433
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $4,474 | $1,800 |
$3,071
53,927
kWh
|
$1,403
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $146 | $70 |
$97
1,758
kWh
|
$49
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.8121: Apply for tax-free status for energy purchases | $984 | $250 | - | - | - | $984 | - | |
| 10 | 2.2437: Recover waste heat from equipment | $2,450 | $11,000 | - | - |
$2,450
-
MMBtu
|
- | - | |
| 11 | 2.2437: Recover waste heat from equipment | $1,978 | $3,150 | - | - |
$1,978
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $21,525 | $34,606 |
$11,421
199,003
kWh
|
$4,160
-
kW-mo/yr
|
$4,428
-
MMBtu
|
$984 | $532 | ||
| TOTAL IMPLEMENTED | $8,183 | $8,123 |
$6,387
110,492
kWh
|
$1,796
-
kW-mo/yr
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs