ITAC Assessment: ND0310
ITAC logo
ITAC Assessment: ND0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Printed Sheets for Aerosol Cans
NAICS
n/a
SIC 2796: Platemaking and Related Services
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 190,000
ft2
Annual Production 98,000,000
pieces
Production Hrs. Annual 6,384
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,130 10,740,328
kWh
Natural Gas $594,320 206,736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,720

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings By-product Production Savings
01 2.7442: Keep doors and windows shut when not on use $9,419 $24,900 - $9,419
-
MMBtu
- - -
02 2.7243: Improve air circulation with destratification fans / other methods $27,164 $9,600 $(-233.0)
(-5,862)
kWh
$27,397
-
MMBtu
- - -
03 2.7226: Use computer programs to optimize hvac performance $56,650 $65,000 - - - $56,650 -
04 2.7291: Reschedule and rearrange multiple-source heating systems $1,487 - - $1,487
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,890 $8,263 $1,890
46,307
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $501 $880 $217
5,275
kWh
- $284 - -
07 2.7135: Install occupancy sensors $1,001 $600 $1,001
24,619
kWh
- - - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $60 $200 $83
2,052
kWh
$(-23.0)
-
MMBtu
- - -
09 2.6121: Reduce hot water temperature to the minimum required $2 - $2
293
kWh
- - - -
10 2.1332: Convert combustion equipment to burn natural gas $15,186 $42,730 - - - - $15,186
TOTAL RECOMMENDED $113,360 $152,173 $2,960
72,684
kWh
$38,280
-
MMBtu
$284 $56,650 $15,186
TOTAL IMPLEMENTED $94,720 $99,500 $(-233.0)
(-5,862)
kWh
$38,303
-
MMBtu
- $56,650 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs