Assessment Year | 2006 |
---|---|
Principal Product | Specialty plating chemicals |
NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
100,000
ft2
|
Annual Production | 36,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $220,134 | 6,543,076 |
kWh
|
$0.034 |
Electricity Demand | $144,422 | 13,696 |
kW-mo/yr
|
$10.54 |
Natural Gas | $212,228 | 18,096 |
MMBtu
|
$11.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,723 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $291 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $8,498 | $4,000 |
$5,725
177,903
kWh
|
$2,773
-
kW-mo/yr
|
- | |
02 | 2.4226: Use / purchase optimum sized compressor | $2,488 | $8,000 |
$2,488
77,308
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,461 | $4,000 |
$2,147
66,735
kWh
|
- |
$1,314
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,300 | $50 |
$4,428
137,600
kWh
|
$1,872
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,538 | $2,465 |
$656
20,394
kWh
|
$882
-
kW-mo/yr
|
- | |
06 | 2.7134: Use photocell controls | $147 | $95 |
$54
1,664
kWh
|
$93
-
kW-mo/yr
|
- | |
07 | 2.7134: Use photocell controls | $291 | $95 |
$130
4,030
kWh
|
$161
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $22,723 | $18,705 |
$15,628
485,634
kWh
|
$5,781
-
kW-mo/yr
|
$1,314
-
MMBtu
|
||
TOTAL IMPLEMENTED | $291 | $95 |
$130
4,030
kWh
|
$161
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs