ITAC Assessment: ND0309
ITAC logo
ITAC Assessment: ND0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Injection-Molded Plastic Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 87,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Demand $227,719 18,074
kW-mo/yr
Electricity Fees $341 -
Natural Gas $4,173 814
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,093

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.8112: Combine utility meters $12,379 $24,759 - - $12,379 - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,616 $17,376 $3,186
75,029
kWh
$1,430
-
kW-mo/yr
- - - - -
03 3.5311: Recover and reuse waste material $3,750 $125 - - - - - $3,750
-
lb
-
04 4.131: Modify process to reduce material use/cost $1,604 $2,500 - - - - - - $1,604
-
Tgal
05 2.4221: Install compressor air intakes in coolest locations $1,366 $1,000 $913
24,033
kWh
$453
-
kW-mo/yr
- - - - -
06 3.8211: Convert to aqueous cleaning system $848 $100 - - - - $848
-
gal
- -
07 4.821: Pay bills on time to avoid late fees $478 - - - $478 - - - -
08 2.7135: Install occupancy sensors $458 $800 $329
7,620
kWh
$129
-
kW-mo/yr
- - - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $131 $60 $131
2,345
kWh
- - - - - -
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $101 $250 $161
2,638
kWh
- - $(-60.0)
-
MMBtu
- - -
11 2.6121: Reduce hot water temperature to the minimum required $20 $20 $20
293
kWh
- - - - - -
TOTAL RECOMMENDED $25,751 $46,990 $4,740
111,958
kWh
$2,012
-
kW-mo/yr
$12,857 $(-60.0)
-
MMBtu
$848
-
gal
$3,750
-
lb
$1,604
-
Tgal
TOTAL IMPLEMENTED $6,093 $17,556 $3,337
77,667
kWh
$1,430
-
kW-mo/yr
$478 - $848
-
gal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs