Assessment Year | 1998 |
---|---|
Principal Product | Injection-Molded Plastic Parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
87,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Demand | $227,719 | 18,074 |
kW-mo/yr
|
$12.60 |
Electricity Fees | $341 | - |
|
- |
Natural Gas | $4,173 | 814 |
MMBtu
|
$5.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,751 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,093 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8112: Combine utility meters | $12,379 | $24,759 | - | - | $12,379 | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,616 | $17,376 |
$3,186
75,029
kWh
|
$1,430
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 3.5311: Recover and reuse waste material | $3,750 | $125 | - | - | - | - | - |
$3,750
-
lb
|
- | |
04 | 4.131: Modify process to reduce material use/cost | $1,604 | $2,500 | - | - | - | - | - | - |
$1,604
-
Tgal
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $1,366 | $1,000 |
$913
24,033
kWh
|
$453
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 3.8211: Convert to aqueous cleaning system | $848 | $100 | - | - | - | - |
$848
-
gal
|
- | - | |
07 | 4.821: Pay bills on time to avoid late fees | $478 | - | - | - | $478 | - | - | - | - | |
08 | 2.7135: Install occupancy sensors | $458 | $800 |
$329
7,620
kWh
|
$129
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $131 | $60 |
$131
2,345
kWh
|
- | - | - | - | - | - | |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $101 | $250 |
$161
2,638
kWh
|
- | - |
$(-60.0)
-
MMBtu
|
- | - | - | |
11 | 2.6121: Reduce hot water temperature to the minimum required | $20 | $20 |
$20
293
kWh
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $25,751 | $46,990 |
$4,740
111,958
kWh
|
$2,012
-
kW-mo/yr
|
$12,857 |
$(-60.0)
-
MMBtu
|
$848
-
gal
|
$3,750
-
lb
|
$1,604
-
Tgal
|
||
TOTAL IMPLEMENTED | $6,093 | $17,556 |
$3,337
77,667
kWh
|
$1,430
-
kW-mo/yr
|
$478 | - |
$848
-
gal
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs