Assessment Year | 1998 |
---|---|
Principal Product | Van Conversions |
NAICS |
n/a
|
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $100 M to 500M |
# of Employees | 407 |
Plant Area |
557,000
ft2
|
Annual Production | 17,661
units
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $237,214 | 5,586,460 |
kWh
|
$0.042 |
Electricity Demand | $153,670 | 21,341 |
kW-mo/yr
|
$7.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $89,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,664 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $4,789 | $250 | - | - | - | - | $2,389 | - | - | $2,400 | |
02 | 2.7124: Make a practice of turning off lights when not needed | $1,135 | $200 |
$1,135
10,844
kWh
|
- | - | - | - | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,628 | $840 |
$1,628
15,826
kWh
|
- | - | - | - | - | - | - | |
04 | 2.8112: Combine utility meters | $8,974 | $9,000 | - | - | - | - | $8,974 | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $868 | $1,000 |
$868
8,499
kWh
|
- | - | - | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $923 | $715 |
$693
6,448
kWh
|
- | - | - | - | $230 | - | - | |
07 | 2.4151: Develop a repair/replace policy | $1,416 | $3,847 |
$373
3,224
kWh
|
- | - | - | - | $1,043 | - | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $488 | $850 |
$610
5,862
kWh
|
- |
$(-122.0)
-
MMBtu
|
- | - | - | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $34 | $70 |
$34
293
kWh
|
- | - | - | - | - | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,626 | $7,750 |
$1,626
15,240
kWh
|
- | - | - | - | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,649 | $16,479 |
$2,649
24,912
kWh
|
- | - | - | - | - | - | - | |
12 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $8,560 | $58,000 |
$(-7,190.0)
(-67,995)
kWh
|
- | - |
$15,750
-
lb
|
- | - | - | - | |
13 | 2.8121: Apply for tax-free status for energy purchases | $11,316 | $250 | - | - | - | - | $11,316 | - | - | - | |
14 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $84 | $70 |
$84
2,638
kWh
|
- | - | - | - | - | - | - | |
15 | 2.4221: Install compressor air intakes in coolest locations | $443 | $298 |
$443
14,947
kWh
|
- | - | - | - | - | - | - | |
16 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $340 | $214 |
$113
2,345
kWh
|
$57
-
kW-mo/yr
|
- | - | - | $170 | - | - | |
17 | 2.2211: Use optimum temperature | $103 | $60 |
$103
3,224
kWh
|
- | - | - | - | - | - | - | |
18 | 2.3212: Optimize plant power factor | $460 | $460 | - | - | - | - | $460 | - | - | - | |
19 | 2.7124: Make a practice of turning off lights when not needed | $981 | $1,400 |
$541
13,482
kWh
|
$440
-
kW-mo/yr
|
- | - | - | - | - | - | |
20 | 2.4151: Develop a repair/replace policy | $18,807 | $12,749 |
$657
17,878
kWh
|
$327
-
kW-mo/yr
|
- | - | - | - | - | $17,823 | |
21 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $580 | $990 |
$197
6,155
kWh
|
$64
-
kW-mo/yr
|
- | - | - | $319 | - | - | |
22 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,409 | $9,134 |
$4,422
141,559
kWh
|
$987
-
kW-mo/yr
|
- | - | - | - | - | - | |
23 | 2.7135: Install occupancy sensors | $703 | $1,800 |
$703
9,672
kWh
|
- | - | - | - | - | - | - | |
24 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $358 | $120 |
$346
4,982
kWh
|
$12
-
kW-mo/yr
|
- | - | - | - | - | - | |
25 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $994 | $1,120 |
$443
9,379
kWh
|
$55
-
kW-mo/yr
|
- | - | - | $496 | - | - | |
26 | 2.4221: Install compressor air intakes in coolest locations | $752 | $1,000 |
$752
10,844
kWh
|
- | - | - | - | - | - | - | |
27 | 2.7135: Install occupancy sensors | $417 | $1,200 |
$265
9,672
kWh
|
$152
-
kW-mo/yr
|
- | - | - | - | - | - | |
28 | 2.2437: Recover waste heat from equipment | $737 | $1,500 | - | - |
$737
-
MMBtu
|
- | - | - | - | - | |
29 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $191 | $700 |
$258
3,517
kWh
|
- |
$(-67.0)
-
MMBtu
|
- | - | - | - | - | |
30 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $993 | $5,012 |
$644
13,482
kWh
|
$349
-
kW-mo/yr
|
- | - | - | - | - | - | |
31 | 2.8121: Apply for tax-free status for energy purchases | $5,671 | $500 | - | - | - | - | $5,671 | - | - | - | |
32 | 2.8112: Combine utility meters | $681 | $550 | - | - | - | - | $681 | - | - | - | |
33 | 2.4151: Develop a repair/replace policy | $5,950 | $7,897 |
$346
7,034
kWh
|
$157
-
kW-mo/yr
|
- | - | - | - |
$5,447
-
Tgal
|
- | |
TOTAL RECOMMENDED | $89,060 | $146,025 |
$12,743
293,963
kWh
|
$2,600
-
kW-mo/yr
|
$548
-
MMBtu
|
$15,750
-
lb
|
$29,491 | $2,258 |
$5,447
-
Tgal
|
$20,223 | ||
TOTAL IMPLEMENTED | $10,664 | $59,100 |
$(-5,098.0)
(-44,256)
kWh
|
$12
-
kW-mo/yr
|
- |
$15,750
-
lb
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs