ITAC Assessment: ND0302
ITAC logo
ITAC Assessment: ND0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Screw Machine Products
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 25,000
ft2
Annual Production 6,500,000
pieces
Production Hrs. Annual 4,896
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,321 705,451
kWh
Electricity Demand $10,149 2,378
kW-mo/yr
Electricity Fees $303 -
Natural Gas $2,743 472
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $9,033 $9,050 $7,286
116,647
kWh
$1,747
-
kW-mo/yr
- - -
02 2.2515: Use optimum thickness insulation $3,747 $7,563 - - - $3,747
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,152 $939 $2,152
34,584
kWh
- - - -
04 2.7135: Install occupancy sensors $453 $1,200 $453
7,327
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $345 $80 $345
5,569
kWh
- - - -
06 3.5316: Contract a wood pallet recycling company $315 $60 - - - - $315
-
lb
07 2.4221: Install compressor air intakes in coolest locations $287 $60 $287
6,741
kWh
- - - -
08 2.8114: Change rate schedules or other changes in utility service $280 $1,200 - - $280 - -
09 2.2515: Use optimum thickness insulation $260 $398 - - - $260
-
MMBtu
-
10 2.7124: Make a practice of turning off lights when not needed $189 - $189
2,931
kWh
- - - -
11 4.821: Pay bills on time to avoid late fees $123 - - - $123 - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $34 $65 $34
293
kWh
- - - -
TOTAL RECOMMENDED $17,218 $20,615 $10,746
174,092
kWh
$1,747
-
kW-mo/yr
$403 $4,007
-
MMBtu
$315
-
lb
TOTAL IMPLEMENTED $972 $140 $534
8,500
kWh
- $123 - $315
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs