| Assessment Year | 1998 |
|---|---|
| Principal Product | Automotive Hoses and Connectors |
| NAICS |
n/a
|
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 443 |
| Plant Area |
172,000
ft2
|
| Annual Production | 8,500,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $200,597 | 5,959,555 |
kWh
|
$0.034 |
| Electricity Demand | $116,030 | 12,709 |
kW-mo/yr
|
$9.13 |
| Electricity Fees | $7,384 | - |
|
- |
| Natural Gas | $57,030 | 8,487 |
MMBtu
|
$6.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $154,667 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $42,268 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7124: Make a practice of turning off lights when not needed | $19,058 | $2,430 |
$18,776
557,737
kWh
|
- | $282 | - | - | - | - | - | |
| 02 | 2.3212: Optimize plant power factor | $2,247 | $4,950 | - | - | $2,247 | - | - | - | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,048 | $16,228 |
$2,867
85,287
kWh
|
$1,121
-
kW-mo/yr
|
$60 | - | - | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,881 | $520 |
$5,796
169,109
kWh
|
- | $85 | - | - | - | - | - | |
| 05 | 2.7261: Install timers and/or thermostats | $896 | $472 |
$883
26,377
kWh
|
- | $13 | - | - | - | - | - | |
| 06 | 2.8114: Change rate schedules or other changes in utility service | $2,782 | $25 | - | - | - | - | - | - | $2,782 | - | |
| 07 | 3.4114: Replace city water with recycled water via cooling tower | $107,455 | $7,165 |
$(-2,681.0)
(-78,253)
kWh
|
- | - |
$56,803
-
Tgal
|
- |
$53,333
-
Tgal
|
- | - | |
| 08 | 4.431: Train operators for maximum operating efficiency | $2,652 | $2,025 | - | - | - | - | $(-5,616.0) | - | - | $8,268 | |
| 09 | 4.122: Develop standard procedures to improve internal yields | $9,648 | $2,025 | - | - | - | - | $(-5,616.0) | - | - | $15,264 | |
| TOTAL RECOMMENDED | $154,667 | $35,840 |
$25,641
760,257
kWh
|
$1,121
-
kW-mo/yr
|
$2,687 |
$56,803
-
Tgal
|
$(-11,232.0) |
$53,333
-
Tgal
|
$2,782 | $23,532 | ||
| TOTAL IMPLEMENTED | $42,268 | $11,975 |
$24,572
726,846
kWh
|
- | $2,614 | - | $(-11,232.0) | - | $2,782 | $23,532 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs