ITAC Assessment: MS0122
ITAC logo
ITAC Assessment: MS0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Automotive Hoses and Connectors
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 443
Plant Area 172,000
ft2
Annual Production 8,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,597 5,959,555
kWh
Electricity Demand $116,030 12,709
kW-mo/yr
Electricity Fees $7,384 -
Natural Gas $57,030 8,487
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,268

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 2.7124: Make a practice of turning off lights when not needed $19,058 $2,430 $18,776
557,737
kWh
- $282 - - - - -
02 2.3212: Optimize plant power factor $2,247 $4,950 - - $2,247 - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,048 $16,228 $2,867
85,287
kWh
$1,121
-
kW-mo/yr
$60 - - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,881 $520 $5,796
169,109
kWh
- $85 - - - - -
05 2.7261: Install timers and/or thermostats $896 $472 $883
26,377
kWh
- $13 - - - - -
06 2.8114: Change rate schedules or other changes in utility service $2,782 $25 - - - - - - $2,782 -
07 3.4114: Replace city water with recycled water via cooling tower $107,455 $7,165 $(-2,681.0)
(-78,253)
kWh
- - $56,803
-
Tgal
- $53,333
-
Tgal
- -
08 4.431: Train operators for maximum operating efficiency $2,652 $2,025 - - - - $(-5,616.0) - - $8,268
09 4.122: Develop standard procedures to improve internal yields $9,648 $2,025 - - - - $(-5,616.0) - - $15,264
TOTAL RECOMMENDED $154,667 $35,840 $25,641
760,257
kWh
$1,121
-
kW-mo/yr
$2,687 $56,803
-
Tgal
$(-11,232.0) $53,333
-
Tgal
$2,782 $23,532
TOTAL IMPLEMENTED $42,268 $11,975 $24,572
726,846
kWh
- $2,614 - $(-11,232.0) - $2,782 $23,532
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs