ITAC Assessment: ND0300
ITAC logo
ITAC Assessment: ND0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product lawn vacuum attachments
NAICS
n/a
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $5
M
to 10
M
# of Employees 38
Plant Area 40,000
ft2
Annual Production 942,000
lb
Production Hrs. Annual 2,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,342 213,072
kWh
Other Gas $13,998 16,378
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,379

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Other Liquid (haz) Savings Administrative Changes Savings Primary Product Savings
01 4.322: Eliminate old stock and modify inventory control $32,850 $11,000 - - - - - $32,850
02 2.4133: Use most efficient type of electric motors $1,737 $3,860 $1,168
16,120
kWh
$569
-
kW-mo/yr
- - - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $882 $280 - - $882
-
MMBtu
- - -
04 3.8221: Use alternatives for acids / alkaline (water, steam, abrasive) $213 $50 - - - $213
-
gal
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $214 $150 $214
5,862
kWh
- - - - -
06 4.821: Pay bills on time to avoid late fees $186 - - - - - $186 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $148 $330 $148
1,465
kWh
- - - - -
08 2.7122: Disconnect ballasts $134 $311 $134
1,758
kWh
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $19 $6 $19
293
kWh
- - - - -
10 2.6218: Turn off equipment when not in use $14 $40 $14
293
kWh
- - - - -
TOTAL RECOMMENDED $36,397 $16,027 $1,697
25,791
kWh
$569
-
kW-mo/yr
$882
-
MMBtu
$213
-
gal
$186 $32,850
TOTAL IMPLEMENTED $33,379 $11,837 $529
9,671
kWh
- - - - $32,850
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Other Liquid (haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs