ITAC Assessment: ND0293
ITAC logo
ITAC Assessment: ND0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Dental Supplies
NAICS
n/a
SIC 3843: Dental Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,059 3,002,345
kWh
Electricity Demand $67,051 8,923
kW-mo/yr
Natural Gas $72,586 11,535
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,616 $28,682 $3,633
103,751
kWh
$3,983
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $3,449 $5,790 $1,328
43,962
kWh
$2,121
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,748 $2,860 $460
12,896
kWh
$366
-
kW-mo/yr
- $922
04 2.2628: Utilize a less expensive cooling method $1,052 $500 $1,052
36,049
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $823 $800 $491
13,775
kWh
$332
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $638 $100 $376
10,551
kWh
$262
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $481 $800 $387
7,913
kWh
$94
-
kW-mo/yr
- -
08 2.7111: Reduce illumination to minimum necessary levels $452 $340 $271
7,620
kWh
$181
-
kW-mo/yr
- -
09 2.6218: Turn off equipment when not in use $82 $167 $82
2,052
kWh
- - -
10 2.8112: Combine utility meters $9,790 $19,581 - - $9,790 -
11 2.8121: Apply for tax-free status for energy purchases $8,731 $600 - - $8,731 -
12 2.8123: Pay utility bills on time $510 - - - $510 -
TOTAL RECOMMENDED $35,372 $60,220 $8,080
238,569
kWh
$7,339
-
kW-mo/yr
$19,031 $922
TOTAL IMPLEMENTED $5,835 $8,750 $2,164
67,409
kWh
$2,749
-
kW-mo/yr
- $922
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs