ITAC Assessment: ND0292
ITAC logo
ITAC Assessment: ND0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Orthopedic Instruments
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 202
Plant Area 51,000
ft2
Annual Production 77,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $222,457 4,183,763
kWh
Electricity Demand $81,508 7,858
kW-mo/yr
Electricity Fees $(-51,171.0) -
Natural Gas $9,814 1,846
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,492

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $1,922 $2,510 $1,457
27,550
kWh
$465
-
kW-mo/yr
- - -
02 2.2511: Insulate bare equipment $2,468 $338 - - - $2,468
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,452 $6,303 $1,142
21,395
kWh
$1,310
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,679 $80 $1,479
27,843
kWh
$200
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,312 $950 $1,168
21,981
kWh
$144
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $911 $900 $420
7,913
kWh
$65
-
kW-mo/yr
- - $426
07 2.7142: Utilize higher efficiency lamps and/or ballasts $301 $208 $157
4,396
kWh
$105
-
kW-mo/yr
- - $39
08 2.6218: Turn off equipment when not in use $96 - $96
1,758
kWh
- - - -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $59 $350 - - $59 - -
10 2.3212: Optimize plant power factor $4,292 $9,475 - - $4,292 - -
TOTAL RECOMMENDED $15,492 $21,114 $5,919
112,836
kWh
$2,289
-
kW-mo/yr
$4,351 $2,468
-
MMBtu
$465
TOTAL IMPLEMENTED $15,492 $21,114 $5,919
112,836
kWh
$2,289
-
kW-mo/yr
$4,351 $2,468
-
MMBtu
$465
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs