ITAC Assessment: MA0495
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Moldings and picture frames
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 29,000
ft2
Annual Production 3,900
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,899 1,010,700
kWh
Electricity Demand $22,945 2,490
kW-mo/yr
Electricity Fees $2,221 -
LPG $2,352 167
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,900 - $1,900
22,218
kWh
-
02 2.3212: Optimize plant power factor $1,530 $2,100 - $1,530
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $500 $600 $500
6,000
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $460 - $460
5,363
kWh
-
05 2.6218: Turn off equipment when not in use $450 - $450
4,500
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $370 $100 $370
4,300
kWh
-
TOTAL RECOMMENDED $5,210 $2,800 $3,680
42,381
kWh
$1,530
-
kW-mo/yr
TOTAL IMPLEMENTED $3,230 $700 $3,230
37,881
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs