ITAC Assessment: MS0069
ITAC logo
ITAC Assessment: MS0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Ductile Iron Castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 69
Plant Area 36,000
ft2
Annual Production 4,507,114
lb
Production Hrs. Annual 4,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,070 5,330,305
kWh
Electricity Fees $72,698 -
Natural Gas $54,850 10,257
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
01 2.4314: Use synthetic lubricant $1,743 $300 $1,284
30,188
kWh
$459 - -
02 2.2437: Recover waste heat from equipment $2,677 $2,740 - - $2,677
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,360 $7,226 $3,196
85,873
kWh
$1,164 - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,012 $925 $767
18,171
kWh
$245 - -
05 2.3137: Use power during off-peak periods $81,053 - - $81,053 - -
06 4.431: Train operators for maximum operating efficiency $10,080 $640 - - - $10,080
TOTAL RECOMMENDED $100,925 $11,831 $5,247
134,232
kWh
$82,921 $2,677
-
MMBtu
$10,080
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs