ITAC Assessment: ND0289
ITAC logo
ITAC Assessment: ND0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Machines and machined parts
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 48,500
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,133 1,071,805
kWh
Electricity Demand $31,076 2,726
kW-mo/yr
Natural Gas $15,212 3,831
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,533

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $4,054 $2,780 $2,308
58,910
kWh
$1,746
-
kW-mo/yr
- - -
02 3.8221: Use alternatives for acids / alkaline (water, steam, abrasive) $3,386 $50 - - - - $3,386
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,506 $582 - - $1,506
-
MMBtu
- -
04 2.4221: Install compressor air intakes in coolest locations $1,301 $500 $1,301
18,171
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $831 $200 $831
11,430
kWh
- - - -
06 2.7135: Install occupancy sensors $701 $600 $419
9,672
kWh
$282
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $545 $53 $325
7,620
kWh
$220
-
kW-mo/yr
- - -
08 3.5316: Contract a wood pallet recycling company $312 - - - - - $312
09 2.7447: Install vinyl strip / high speed / air curtain doors $185 $516 - - $185
-
MMBtu
- -
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $180 $200 - - - $180
-
gal
-
11 4.311: Schedule deliveries according to demand $135 - - - - - $135
12 2.7447: Install vinyl strip / high speed / air curtain doors $103 $57 - - $103
-
MMBtu
- -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $29 $55 $17
293
kWh
$12
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $13,268 $5,593 $5,201
106,096
kWh
$2,260
-
kW-mo/yr
$1,794
-
MMBtu
$180
-
gal
$3,833
TOTAL IMPLEMENTED $5,533 $3,090 $3,464
77,960
kWh
$1,966
-
kW-mo/yr
$103
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs