Assessment Year | 1997 |
---|---|
Principal Product | sweeteners |
NAICS |
n/a
|
SIC | 2061: Cane Sugar, Except Refining |
Sales Range | $50 M to 100M |
# of Employees | 75 |
Plant Area |
115,000
ft2
|
Annual Production | 150,000,000
lb
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $143,109 | 2,435,815 |
kWh
|
$0.059 |
Electricity Demand | $46,400 | 5,481 |
kW-mo/yr
|
$8.47 |
Natural Gas | $81,435 | 23,448 |
MMBtu
|
$3.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,631 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,628 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,628 | $492 |
$1,381
22,274
kWh
|
$247
-
kW-mo/yr
|
- | |
02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $2,921 | $2,000 | - | - |
$2,921
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $922 | $400 |
$922
14,947
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $838 | $75 |
$838
13,482
kWh
|
- | - | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $791 | $1,039 | - | - |
$791
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $271 | $133 |
$271
2,931
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $412 | $400 |
$412
5,275
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $320 | $270 |
$320
2,638
kWh
|
- | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $269 | $1,000 | - | - |
$269
-
MMBtu
|
|
10 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $170 | - |
$170
2,345
kWh
|
- | - | |
11 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $89 | $300 | - | - |
$89
-
MMBtu
|
|
TOTAL RECOMMENDED | $8,631 | $6,109 |
$4,314
63,892
kWh
|
$247
-
kW-mo/yr
|
$4,070
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,628 | $492 |
$1,381
22,274
kWh
|
$247
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs