ITAC Assessment: ND0287
ITAC logo
ITAC Assessment: ND0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product sweeteners
NAICS
n/a
SIC 2061: Cane Sugar, Except Refining
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 115,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,109 2,435,815
kWh
Electricity Demand $46,400 5,481
kW-mo/yr
Natural Gas $81,435 23,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,628 $492 $1,381
22,274
kWh
$247
-
kW-mo/yr
-
02 2.7491: Insulate glazing, walls, ceilings, and roofs $2,921 $2,000 - - $2,921
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $922 $400 $922
14,947
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $838 $75 $838
13,482
kWh
- -
05 2.7491: Insulate glazing, walls, ceilings, and roofs $791 $1,039 - - $791
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $271 $133 $271
2,931
kWh
- -
07 2.7135: Install occupancy sensors $412 $400 $412
5,275
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $320 $270 $320
2,638
kWh
- -
09 2.1233: Analyze flue gas for proper air/fuel ratio $269 $1,000 - - $269
-
MMBtu
10 2.7121: Utilize daylight whenever possible in lieu of artificial light $170 - $170
2,345
kWh
- -
11 2.7491: Insulate glazing, walls, ceilings, and roofs $89 $300 - - $89
-
MMBtu
TOTAL RECOMMENDED $8,631 $6,109 $4,314
63,892
kWh
$247
-
kW-mo/yr
$4,070
-
MMBtu
TOTAL IMPLEMENTED $1,628 $492 $1,381
22,274
kWh
$247
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings