ITAC Assessment: ND0260
ITAC logo
ITAC Assessment: ND0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Doors
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 310,000
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 3,500
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,400 4,634,525
kWh
Electricity Demand $67,487 17,085
kW-mo/yr
Electricity Fees $11,310 -
Natural Gas $75,930 17,572
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,182 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $880 $260 n/a $880
15,826
kWh
- - - -
02 2.7135: Install occupancy sensors $719 $400 n/a $719
12,896
kWh
- - - -
03 2.6218: Turn off equipment when not in use $203 $504 n/a $203
3,517
kWh
- - - -
04 2.6218: Turn off equipment when not in use $153 $40 n/a $153
2,638
kWh
- - - -
05 2.7134: Use photocell controls $275 $600 n/a $275
4,982
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,362 $1,282 n/a $1,089
23,154
kWh
$273
-
kW-mo/yr
- - -
07 2.2437: Recover waste heat from equipment $1,431 $460 n/a - - $1,431
-
MMBtu
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,635 $1,000 n/a $4,635
83,529
kWh
- - - -
09 2.3511: Use plant owned transformers or lease transformers $29,520 $100,000 n/a - - - - $29,520
10 2.7447: Install vinyl strip / high speed / air curtain doors $781 $1,156 n/a - - $781
-
MMBtu
- -
11 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,223 $200 n/a - - - $3,223
-
gal
-
TOTAL RECOMMENDED $43,182 $105,902 $7,954
146,542
kWh
$273
-
kW-mo/yr
$2,212
-
MMBtu
$3,223
-
gal
$29,520
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs