ITAC Assessment: ND0255
ITAC logo
ITAC Assessment: ND0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Fabricated Metal Parts
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 92
Plant Area 80,000
ft2
Annual Production 6,500,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,617 1,037,222
kWh
Electricity Demand $12,830 3,248
kW-mo/yr
Electricity Fees $2,078 -
Natural Gas $6,887 1,541
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,335

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.4221: Install compressor air intakes in coolest locations $543 $360 $543
9,672
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $843 $180 $843
15,240
kWh
- - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $333 $515 - - $333
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $105 $100 $56
1,172
kWh
$49
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $51 $360 $42
879
kWh
$9
-
kW-mo/yr
- -
06 2.6218: Turn off equipment when not in use $216 $1,050 $216
3,810
kWh
- - -
07 2.4133: Use most efficient type of electric motors $1,514 $3,650 $1,239
22,274
kWh
$275
-
kW-mo/yr
- -
08 3.7211: Modify material application methods $4,657 $11,800 - - - $4,657
-
gal
TOTAL RECOMMENDED $8,262 $18,015 $2,939
53,047
kWh
$333
-
kW-mo/yr
$333
-
MMBtu
$4,657
-
gal
TOTAL IMPLEMENTED $7,335 $16,780 $2,354
42,496
kWh
$324
-
kW-mo/yr
- $4,657
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs