ITAC Assessment: ND0253
ITAC logo
ITAC Assessment: ND0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Heating wire and elements
NAICS
n/a
SIC 3643: Current-Carrying Wiring Devices
Sales Range $1
M
to 5
M
# of Employees 250
Plant Area 45,000
ft2
Annual Production 37,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,275 1,458,675
kWh
Electricity Demand $37,558 3,470
kW-mo/yr
Electricity Fees $(-13,232.0) -
Natural Gas $27,076 7,618
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,227 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,980 $719 $1,435
32,532
kWh
$545
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $315 $690 $269
4,396
kWh
$46
-
kW-mo/yr
- - - -
03 2.8112: Combine utility meters $5,363 $2,500 - - $5,363 - - -
04 2.3212: Optimize plant power factor $474 $3,612 - - $474 - - -
05 2.6218: Turn off equipment when not in use $226 $70 $226
3,517
kWh
- - - - -
06 2.4133: Use most efficient type of electric motors $860 $5,940 $698
11,430
kWh
$162
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $932 $1,400 $932
12,309
kWh
- - - - -
08 2.4221: Install compressor air intakes in coolest locations $200 $100 $200
3,224
kWh
- - - - -
09 2.4221: Install compressor air intakes in coolest locations $504 $100 $504
8,792
kWh
- - - - -
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18 $1,000 $25
293
kWh
- - $(-7.0)
-
MMBtu
- -
11 3.5311: Recover and reuse waste material $1,355 $700 - - - - $3
-
lb
$1,352
TOTAL RECOMMENDED $12,227 $16,831 $4,289
76,493
kWh
$753
-
kW-mo/yr
$5,837 $(-7.0)
-
MMBtu
$3
-
lb
$1,352
TOTAL IMPLEMENTED $3,145 $6,910 $1,628
26,963
kWh
$162
-
kW-mo/yr
- - $3
-
lb
$1,352
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs