Assessment Year | 2014 |
---|---|
Principal Product | Pharmaceutical Manufacturing and Development |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $100 M to 500M |
# of Employees | 620 |
Plant Area |
505,000
ft2
|
Annual Production | 3,993
bushels
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,346,813 | 41,694,502 |
kWh
|
$0.032 |
Electricity Demand | $1,360,410 | 89,972 |
kW-mo/yr
|
$15.12 |
Natural Gas | $1,335,397 | 261,044 |
MMBtu
|
$5.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $841,066 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $430,541 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $235 | - |
$138
4,660
kWh
|
$97
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 3.4115: Recover and reuse cooling water | $5,500 | $2,000 | - | - | - | - |
$3,770
-
Tgal
|
- | - |
$1,730
-
Tgal
|
|
03 | 2.2437: Recover waste heat from equipment | $10,400 | $10,000 |
$(-100.0)
(-3,380)
kWh
|
$(-70.0)
-
kW-mo/yr
|
- |
$10,570
-
MMBtu
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,016 | $1,000 |
$2,539
86,000
kWh
|
$1,777
-
kW-mo/yr
|
$(-300.0) | - | - | - | - | - | |
05 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $332,549 | $400,000 |
$36,159
1,224,879
kWh
|
$134,299
-
kW-mo/yr
|
- |
$162,091
-
MMBtu
|
- | - | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $19,208 | $40,430 |
$17,941
60,776
kWh
|
$1,267
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 2.4113: Install motor voltage controller on lightly loaded motors | $11,334 | $18,902 |
$6,667
225,859
kWh
|
$4,667
-
kW-mo/yr
|
- | - | - | - | - | - | |
08 | 2.2622: Replace existing chiller with high efficiency model | $377,548 | $1,083,820 |
$109,567
3,711,630
kWh
|
$267,981
-
kW-mo/yr
|
- | - | - | - | - | - | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $45,862 | $9,000 |
$(-26.0)
(-865)
kWh
|
$(-1,012.0)
-
kW-mo/yr
|
- | - | - | - | $46,900 | - | |
10 | 3.5217: Reuse / recycle/ sell paper products | $22,280 | - | - | - | - | - | - | - | $22,280 | - | |
11 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $8,744 | $12,000 |
$(-45.0)
(-1,511)
kWh
|
- | - | - | - | - | $8,789 | - | |
12 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $3,390 | - | - | - | - | - | - | $3,390 | - | - | |
TOTAL RECOMMENDED | $841,066 | $1,577,152 |
$172,840
5,308,048
kWh
|
$409,006
-
kW-mo/yr
|
$(-300.0) |
$172,661
-
MMBtu
|
$3,770
-
Tgal
|
$3,390 | $77,969 |
$1,730
-
Tgal
|
||
TOTAL IMPLEMENTED | $430,541 | $1,124,722 |
$116,227
3,937,258
kWh
|
$272,675
-
kW-mo/yr
|
- |
$10,570
-
MMBtu
|
- | - | $31,069 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs