Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product heaters
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $1
M
to 5
M
# of Employees 125
Plant Area 34,400
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,816 1,260,258
kWh
Electricity Demand $21,196 2,522
kW-mo/yr
Electricity Fees $(-8,976.0) -
Natural Gas $10,067 2,444
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,073

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,615 $500 $1,178
19,050
kWh
$437
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $562 $670 $365
7,034
kWh
$197
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $447 $1,000 $447
7,327
kWh
- - - -
04 2.6218: Turn off equipment when not in use $223 $67 $223
3,517
kWh
- - - -
05 2.8112: Combine utility meters $1,562 $4,000 - - $1,562 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $285 $540 $209
3,224
kWh
$76
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $887 $100 $887
14,361
kWh
- - - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $167 $1,000 $153
2,345
kWh
$58
-
kW-mo/yr
- $(-44.0)
-
MMBtu
-
09 3.5212: Regrind, reuse, or sell scrap plastic parts $4,116 $800 - - - - $4,116
-
lb
TOTAL RECOMMENDED $9,864 $8,677 $3,462
56,858
kWh
$768
-
kW-mo/yr
$1,562 $(-44.0)
-
MMBtu
$4,116
-
lb
TOTAL IMPLEMENTED $6,073 $2,177 $1,684
28,136
kWh
$273
-
kW-mo/yr
- - $4,116
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings