ITAC Assessment: ND0250
ITAC logo
ITAC Assessment: ND0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product metal stampings
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 43,000
ft2
Annual Production 9,850,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,965 1,635,404
kWh
Electricity Demand $34,197 4,095
kW-mo/yr
Electricity Fees $793 -
Natural Gas $3,867 777
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,752 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,354

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $350 $200 $350
10,551
kWh
- - - - -
02 2.7135: Install occupancy sensors $490 $1,200 $490
14,947
kWh
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $180 $540 $106
3,224
kWh
$72
-
kW-mo/yr
$2 - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,046 $80 $3,046
92,321
kWh
- - - - -
05 2.6218: Turn off equipment when not in use $90 $756 $90
2,638
kWh
- - - - -
06 2.4133: Use most efficient type of electric motors $1,218 $967 $735
22,274
kWh
$472
-
kW-mo/yr
$11 - - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $103 $300 $153
2,931
kWh
- - $(-50.0)
-
MMBtu
- -
08 3.4141: Replace the chlorination stage with an oxygen or ozone stage $1,275 $14,800 - - - - $637
-
gal
$638
TOTAL RECOMMENDED $6,752 $18,843 $4,970
148,886
kWh
$544
-
kW-mo/yr
$13 $(-50.0)
-
MMBtu
$637
-
gal
$638
TOTAL IMPLEMENTED $4,354 $1,803 $3,871
117,233
kWh
$472
-
kW-mo/yr
$11 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs