Assessment Year | 1996 |
---|---|
Principal Product | Aluminum Parts |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
75,000
ft2
|
Annual Production | 3,500,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $266,334 | 5,071,805 |
kWh
|
$0.053 |
Electricity Demand | $108,885 | 11,546 |
kW-mo/yr
|
$9.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,794 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Liquid (non-haz) Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $6,552 | $5,363 | - | - | $6,552 | - | - | |
02 | 2.7135: Install occupancy sensors | $369 | $400 |
$369
10,258
kWh
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $122 | $100 |
$122
1,465
kWh
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $95 | $50 |
$95
2,052
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $445 | $510 |
$259
8,499
kWh
|
$186
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,505 | $424 |
$1,049
24,033
kWh
|
$456
-
kW-mo/yr
|
- | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $8,075 | $4,930 |
$4,801
150,352
kWh
|
$3,274
-
kW-mo/yr
|
- | - | - | |
08 | 3.3125: Use distillation, evaporation to remove contaminants | $42,197 | $125,000 |
$(-17,807.0)
(-342,907)
kWh
|
- | - |
$59,670
-
gal
|
$334
-
Tgal
|
|
TOTAL RECOMMENDED | $59,360 | $136,777 |
$(-11,112.0)
(-146,248)
kWh
|
$3,916
-
kW-mo/yr
|
$6,552 |
$59,670
-
gal
|
$334
-
Tgal
|
||
TOTAL IMPLEMENTED | $16,794 | $11,377 |
$6,326
186,401
kWh
|
$3,916
-
kW-mo/yr
|
$6,552 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Liquid (non-haz) Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs