Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Car Windows and Doors
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 306,000
ft2
Annual Production 1,788,000
pieces
Production Hrs. Annual 4,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,890 3,704,865
kWh
Electricity Demand $93,316 9,959
kW-mo/yr
Electricity Fees $657 -
Natural Gas $67,430 14,294
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,019 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,524

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $218 $200 - - $218
-
MMBtu
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $247 $1,000 $212
7,034
kWh
$180
-
kW-mo/yr
$(-145.0)
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,404 $1,700 $10,404
187,280
kWh
- - - -
04 2.8121: Apply for tax-free status for energy purchases $1,445 $250 - - - - $1,445
05 2.7491: Insulate glazing, walls, ceilings, and roofs $236 $200 - - $236
-
MMBtu
- -
06 2.4133: Use most efficient type of electric motors $2,581 $7,705 $1,420
46,307
kWh
$1,161
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $15,360 $4,176 $8,448
282,532
kWh
$6,912
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $803 $1,490 $442
9,672
kWh
$361
-
kW-mo/yr
- - -
09 3.4115: Recover and reuse cooling water $21,725 $9,000 - - - $21,725
-
Tgal
-
TOTAL RECOMMENDED $53,019 $25,721 $20,926
532,825
kWh
$8,614
-
kW-mo/yr
$309
-
MMBtu
$21,725
-
Tgal
$1,445
TOTAL IMPLEMENTED $50,524 $22,981 $20,272
516,119
kWh
$8,073
-
kW-mo/yr
$454
-
MMBtu
$21,725
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs